Tonka
Water has recently been awarded the construction of a large industrial water clarifier
system in Texas. This lime softening clarifier is one of the largest in Tonka
Water's prolific installation base with a diameter of just under 60 feet!
To learn more about Tonka Water's clarification equipment, visit our website.
Monday, October 20, 2014
Friday, October 17, 2014
Tonka Water Awarded Biological Treatment Plant
Tonka
Water has received an order for the water treatment plant upgrades at Eagles
Lake, SK for The Canoe Lake Cree Nation. The plant will feature vertical
pressure vessels incorporating biological filtration for drinking water.
For more about Tonka Water, visit our website!
For more about Tonka Water, visit our website!
Wednesday, October 15, 2014
Tonka Water Awarded Utility Project In Florida
A
major Florida utility has awarded Tonka Water the supply of a Reverse Osmosis
pretreatment filter system designed to improve intake water quality. This is
the latest in a series of power utility project awards. For this recent project, Tonka Water will
provide 4 vertical pressure filters with Simul-Wash™
backwash system.
For more about Reverse Osmosis and other filtration systems, visit our website!
For more about Reverse Osmosis and other filtration systems, visit our website!
Monday, July 14, 2014
Delivered Treatment System in Plant Vogtle, Georgia
The newly opened Plant Vogtle water treatment plant is one of Tonka Water's Delivered Treatment Systems (DTS), incorporating multiple processes in a compact building.
This facility provides potable water for offices and facilities at the outer perimeter of Plant Vogtle, GA. Specifically, this DTS includes chemical feed, iron and manganese filtration, high lift pumping from outside ground storage, high lift pumping and complete controls. The capacity rating for this plant is 150 gpm. Another Delivered Treatment System, the City of Aiken’s radium removal system using ion exchange, is nearby - only 40 miles from Plant Vogtle.
This facility provides potable water for offices and facilities at the outer perimeter of Plant Vogtle, GA. Specifically, this DTS includes chemical feed, iron and manganese filtration, high lift pumping from outside ground storage, high lift pumping and complete controls. The capacity rating for this plant is 150 gpm. Another Delivered Treatment System, the City of Aiken’s radium removal system using ion exchange, is nearby - only 40 miles from Plant Vogtle.
Customizable inside and out, a DTS is a great option for your water treatment needs. Delivered ready to connect to your potable water system, start up is incredibly fast and efficient. Take a look at the new plant!
Thursday, May 1, 2014
Tonka Water Project Featured in North Dakota Water Magazine
A project awarded to Tonka Water was featured in the March 2014 issue of North Dakota Water magazine. The project, to be constructed in Dickinson, ND, will feature a UF Membrane filtration system, and will produce 18 million gallons per day. Read the full article after the jump!
Subscribe to:
Posts (Atom)
